PROJECT OVERVIEW
At the Royal College of Nursing, London, we were asked to provide a solution to constant marking of walls and damage to divider supports in the first floor restaurant seating area and breakfast bar.
We installed fire retardant wall protection, colour matched to the existing scheme, along with protective edge trims to the divider supports. The solution provides a robust, hygienic and easy to clean finish while maintaining the look and feel of the space.
The works were carried out with the bench in situ, ensuring minimal disruption to the daily use of the restaurant.
KEY PROJECT DETAILS

Location
Royal College of Nursing, London

Client
Royal College of Nursing

Sector
Heritage / Education

Works
Supply and installation of fire retardant wall protection and edge protectors

Features
Colour matched panels, metal edge trims, corner protection, installed with bench in situ

Completed
–
PROJECT HIGHLIGHTS
Fire retardant wall protection installed to prevent marking and damage
Colour matched to existing colour scheme
Protective edge trims to divider supports
Installed with bench in situ
Durable, hygienic and easy to clean finish
Maintains the look and feel of existing space
Minimal disruption to daily operations
IMAGE GALLERY
SCOPE OF WORKS
Survey existing area and advise on suitable protection solution
Supply and install fire retardant wall protection panels
Install edge protectors to divider supports
Cut panels to size and fit with bench in situ
Finish corners with colour matched stone filler corner protection
Apply colour matched silicone to all joints
Ensure a clean, tidy and professional finish
CHALLENGES & SOLUTIONS

CHALLENGE
Constant marking of walls and damage to divider supports from day-to-day use.
SOLUTION
Fire retardant wall protection and edge trims, colour matched to existing décor, installed with minimal disruption.

CHALLENGE
Works had to be completed while the restaurant remained in use.
SOLUTION
Careful planning, phasing of works and installation with the bench in situ reduced disruption and ensured a high-quality finish.
THE OUTCOME
The first floor restaurant seating area now has durable, hygienic wall protection and reinforced divider supports, effectively preventing future marking and damage. The colour matched finish blends seamlessly with the existing scheme, providing a practical and long-lasting solution while maintaining the clean and welcoming appearance of the space.