PROJECT OVERVIEW
The doors within the Henrietta Foyer and adjoining areas were suffering repeated damage from service trolleys, particularly around the lower sections, edges and corners.
KALR Group developed a bespoke solution combining the full restoration of the existing timber doors with specially manufactured brass protection plates.
The doors were carefully rebated to allow the bespoke brass plates to wrap around the corners and edges, providing effective protection against side impacts from service trolleys.
This recessed design created a neat, integrated finish, protecting vulnerable areas while preserving the original character and heritage appearance of the doors.
KEY PROJECT DETAILS

Location
Henrietta Foyer, London

Client
Royal College of Nursing

Sector
Specialist Joinery

Works
Restoration, bespoke brass protection, installation

Completed
–
PROJECT HIGHLIGHTS
12 doors fully restored
24 bespoke brass panels installed
Door edges rebated for flush-fitting brass plates
Brass protection wraps around vulnerable corners
Retained heritage character and original features
A solution sympathetic to the building’s character
IMAGE GALLERY
before works
protection plate
with brass protection
doors
and finish
door
SCOPE OF WORKS
Removal of 12 existing doors
Stripping of old varnish and finishes
Repairs and making good to damaged timber
Re-varnishing and lacquering
Design and manufacture of bespoke brass protection plates
Careful rebating of door edges and corners
Bespoke brass plates wrapped around door corners
Installation of 24 custom brass protection panels
Cleaning and polishing of existing door features and ironmongery
Reinstallation and final finishing of all doors
CHALLENGES & SOLUTIONS

CHALLENGE
Doors were regularly exposed to repeated side impacts from service trolleys, resulting in damage to door edges and corners, timber finishes.
SOLUTION
Carefully rebated door edges accept custom-made brass protection plates, which wrap seamlessly around corners and edges to provide integrated, long-term impact protection.

ADDITIONAL WORKS
All doors were stripped, made good, re-varnished and lacquered. Existing features and ironmongery were retained, cleaned and polished.
RESULT
A robust, visually integrated solution that protects the doors while retaining their original character.

LIVE ENVIRONMENT
Works were carried out in a live building with constant footfall and service access.
SOLUTION
Careful planning and phased installation ensured minimal disruption to building users, with clean and safe working environments maintained at all times.
THE OUTCOME
The completed works gave the existing doors a renewed, high-quality finish while introducing a robust solution to the recurring impact damage. The 24 bespoke brass protection panels across 12 doors wrap around the rebated corners and edges, providing durable protection from side impacts by service trolleys, while looking like an integral heritage architectural feature. The recessed design allows the brass to sit seamlessly within the doors rather than as an aftermarket addition.
The result is a solution that combines protection, craftsmanship and longevity while retaining the character of the original doors.